The Channel Tunnel: A case study of financing and governance after 25 and 125 years

Fiche du document

Date

20 avril 2022

Type de document
Périmètre
Langue
Identifiant
Relations

Ce document est lié à :
info:eu-repo/semantics/reference/issn/0996-9403

Ce document est lié à :
info:eu-repo/semantics/reference/issn/1775-4224

Organisation

OpenEdition

Licences

All rights reserved , info:eu-repo/semantics/openAccess




Citer ce document

Terence Gourvish, « The Channel Tunnel: A case study of financing and governance after 25 and 125 years », Revue d’histoire des chemins de fer, ID : 10.4000/rhcf.2440


Métriques


Partage / Export

Résumé En Fr

This paper juxtaposes the Channel Tunnel project of the 1880s with the Eurotunnel project 100 years later to reveal issues affecting the financing and governance of large, complex infrastructure projects. The paper concludes by attempting to derive lessons affecting the operation of public-private partnerships and to measure the Tunnel’s success.

Cet article juxtapose le projet du tunnel sous la Manche des années 1880 avec le projet d’Eurotunnel 100 ans plus tard pour mettre en lumière les problèmes qui affectent le financement et la gouvernance des grands projets d’infrastructure complexes. Le document conclut en tentant de tirer des leçons sur le fonctionnement des partenariats public-privé et de mesurer le succès du tunnel.