Moving Ground

Fiche du document

Date

25 juin 2021

Type de document
Périmètre
Langue
Identifiant
Source

Ardeth

Relations

Ce document est lié à :
info:eu-repo/semantics/reference/issn/2532-6457

Ce document est lié à :
info:eu-repo/semantics/reference/issn/2611-934X

Organisation

OpenEdition

Licences

https://creativecommons.org/licenses/by-nc-nd/4.0/ , info:eu-repo/semantics/openAccess




Citer ce document

Chiara Pradel, « Moving Ground », Ardeth, ID : 10670/1.g7p3p9


Métriques


Partage / Export

Résumé 0

Infrastructures as high-speed railways are a contemporary debated topic with political, economic and environmental impacts. In the Alpine arc alone, located in the heart of Europe, as of today six HSR lines are planned or have been realized.Within this framework, the article probes the case of the New Rail Link through the Alps that connects Germany to Italy through Switzerland. This “Infrastructural Monument” in fact produces a number of ground movements that are affecting and shaping the ever-changing Swiss mountainous landscapes: millions of cubic meters of excavated material arising from tunnelling and construction activities are spread among the railway’s nearest territories. What could be the role of design and landscape architecture? This research is intended as an instrument to deepen the design meaning of moving ground actions, reflecting on how, millennia after the first ancestral earth mounds, these monumental earthworks could today become part of a continuously renewed poetic imagination.

document thumbnail

Par les mêmes auteurs

Sur les mêmes sujets

Sur les mêmes disciplines

Exporter en