A faster Enterprise Resources Planning implementation for Euro Coin Supply Chain within the SCOR model

Fiche du document

Date

1 octobre 2007

Type de document
Périmètre
Langue
Identifiants
Collection

Archives ouvertes


Sujets proches En

Administration Pattern Model

Citer ce document

Gilles Neubert et al., « A faster Enterprise Resources Planning implementation for Euro Coin Supply Chain within the SCOR model », HAL-SHS : économie et finance, ID : 10670/1.sr32zi


Métriques


Partage / Export

Résumé En

The present paper deals with the setting up and management of a complex logistic chain for the distribution of Euro Coins on the whole Italian peninsula through an ERP software. In particular, the work is related to a specific SCOR modelling that aims at decreasing software customisations times and minimising some parameters crucial for this supply chain, such as deliveries punctuality, delivery errors, warehouse stockout. After an analysis of the logistic chain, an original configuration of the SCOR has been proposed in which, on the basis of mathematical hypothesis for each level of the SC, some Processes of the SCOR model can be excluded. In addition to the lean configuration obtained, the case study has led to the implementation of some best practices, such as coins tracking and tracing along the chain, and a specific warehouse configuration that has made possible the improvement of some warehouse performances parameters.

document thumbnail

Par les mêmes auteurs

Sur les mêmes sujets

Exporter en