Delay causes in road infrastructure projects in developing countries

Fiche du document

Date

1 septembre 2020

Type de document
Périmètre
Langue
Identifiant
Relations

Ce document est lié à :
10.7764/rdlc.19.2.220

Organisation

SciELO

Licence

info:eu-repo/semantics/openAccess




Citer ce document

Guillermo Mejía et al., « Delay causes in road infrastructure projects in developing countries », Revista de la Construcción, ID : 10670/1.w9i4md


Métriques


Partage / Export

Résumé 0

Project delays adversely affect road infrastructure development in developing countries. Unfavorable consequences of project delays involve cost overrun, contractual disputes, arbitration, and quality non-conformities. Despite these risks, literature shows that delays are still a prevalent problem in construction management. Although there is a considerable number of publications on project delays, few studies have compared their causes between developing countries. Therefore, this study aimed to: a) classify and determine the level of influence of the delay causes; b) find the relationship between delay causes and country's development; and c) propose recommendations for mitigating the most critical causes in developing countries. A systematic literature review provided a sample of 14 primary studies from Africa (50%) and Asia (50%). Based on this sample, the study found that developing countries, with a GDP per capita ($US2018)

document thumbnail

Par les mêmes auteurs

Sur les mêmes sujets

Sur les mêmes disciplines

Exporter en